Commissioning of the Grabowo wind farm

Publish this post

We are pleased to inform you that in recent days the Grabowo wind farm with a total capacity of 44MW has been connected to the grid, for the construction of which we were responsible in terms of energy.

Our task was to comprehensively build 18 km of the HN-110 kV cable line with a fiber optic line between GPZ Kolno and GPO Grabowo and comprehensive construction of 16 km of the MV-20 kV cable line with a fiber optic line. 

Both scopes included the assembly of cable joints and heads. The powering up of the farm took place without any problems.

We would like to thank our Principal, the Team and the people we worked with on this project.

also check

STONEMAN 2023 – WE HAVE A PODIUM!

This year's Stoneman Puck, Władysławowo, and Szemud competition series, which we had the pleasure of partnering with, has concluded.

As usual, there were no shortage of challenges and emotions!

Like last year, participants competed in the MINI, MEGA, and SPRINT distances... and once again we proudly look at the results of Sławek Górski, who became the best competitor from Wejherowo County in the MEGA distance, standing on the podium three times!

Congratulations to all the participants of the competition, especially Sławek, and thank you to the organizers for a wonderful time.

OFFICIAL OPENING OF THE DĘBSK WIND FARM

On Thursday, April 13, the official opening of the Dębsk wind farm, the largest onshore wind farm built by Polenergia, took place.

We participated in its creation, being responsible for the comprehensive construction of 85 km of MV - 30kV cable lines together with a fiber optic line, thus connecting 55 turbines.

Our scope also included the assembly of cable joints and heads.

The total capacity of the farm is 121 MW.