We build with energy
and passion

30 years together

We have been on the market since 1989. We started our activity from small electric orders, slowly developing both the scope of our services and the area of activity throughout Poland and Germany. Today, meeting the challenges of the market, we are dynamically operating in the power and teletechnical industry, and we are passionate about implementing wind farm projects.

We want our clients to be sure that the commissioned work, regardless of the difficulties, will be performed with the utmost care, conscientiously and on time. Responsibility for a given word is our motto. Our specialists, thanks to the experience gained and the possibility of using modern equipment, will cope with the greatest challenges!

Cooperation with ELMARK means credibility and trust - and thus the peace and safety of our clients.

We employ qualified technical staff, we cooperate with design offices and experts in the field of energy, law, IT and management. The quality of our services is guaranteed by numerous references, as well as awards and distinctions.

We invite you to cooperation.

our offer

Renewable energy

Construction of MV and WN cable lines
Construction of fiber optic lines
Installation of heads and MV and WN cable joints
Construction of cable junctions and container transfer stations
Removal of collisions with LV, MV and HV overhead lines

Commercial Power Industry

Construction of LV, MV and WN cable lines
Construction of LV and MV overhead lines
Construction of pole and container transformer stations
Construction of LV and MV cable connectors

Cable line measurements

· Damage location
Insulation resistance measurements
· Voltage tests

Fiber optic infrastructure

Construction of a fiber optic sewage system
· Blowing fiber optic cables
Welding of optical fibers

We work

in harmony with nature

We like

Challenges

Our greatest value is

committed employees

partners

Electrum Sp. z o. o. Białystok
Electrum Sp. z o. o. BiałystokVice President
Read More
We certify that PREiB El-Mark Marek Kierznikowicz based in Wejherowo was the contractor of the WN-110Kv cable line from GPO Rajgród - GPZ Grajewo, with a total length of 11.2 km with a fiber optic line with a total length of 11.45 km, for the needs of the Wind Farm Rajgród. The works were carried out in the period from April 2013. until June 2014 according to the previously agreed schedule. The El-Mark company is a professional in the industry, perfectly organized and equipped.
GEO RENEWABLES based in Warsaw
GEO RENEWABLES based in WarsawMember of the Group's Management Board
Read More
We certify that PREiB El-Mark Marek Kierznikowicz, based in Wejherowo, was the contractor of the WN-110kV cable line from GPZ Lubartów to GPO Rudzienko, with a total length of 27.5 km, with a 48J fiber line with a total length of 27.5 km for the needs of the Lubartów Wind Farm. The cable line consisted of 18 sections, to be connected and connected, the El-Mark company made 17 sets of MSA145 couplings with earthing and crossbonding boxes and 2 sets of ESS145 heads. The works were carried out in the period from June 2015 to October 2015, in accordance with the agreed schedule. Noteworthy is the high and professional equipment of the El-Mark company and a very good organization of work. It is a reliable and trustworthy contractor.
Electrum Sp. z o. o. Białystok
Electrum Sp. z o. o. BiałystokVice President
Read More
Electrum Sp. z o. o. ul. Watykańska 13, 15-638 Białystok confirms that PREiB El-Mark Marek Kierznikowicz was the contractor for laying the HV 110kV cable line from GPO Skurpie - GPZ Działdowo with a total length of 8.26 km. The works were carried out in the period from October 2014 to November 2014, according to the schedule. Noteworthy is the high and professional equipment of El-mark and a very good organization of work, which, despite the emerging obstacles, allowed for the timely and fully professional performance of the entrusted task. We assess the quality of the works performed as very good, and the flexibility and communication skills of the company are an additional premise for recommending it to other investors as a reliable, responsible and trustworthy contractor.
PBDI SA, Toruń
PBDI SA, ToruńVice President
Read More
PREiB El-Mark Sp. z o. o. with its seat in Wejherowo, performed works consisting in the construction of the power grid for the needs of Tolkowiec Wind Park for the benefit of PBDI SA with its seat in Toruń at ul. Wapienna 10 in the following scope: - construction of MV-30kV cable lines with 12J fiber-optic lines with a total length of 14.6 km, together with the installation of MV cable couplings and heads and fiber optic cutting, - construction of a field earthing system. Completion date February 2014 - August 2014. The commissioned works were performed in a proper manner, in accordance with the principles of good construction practice and maintaining the appropriate standards and technical parameters. The works were completed correctly and on time. We confirm the organizational efficiency of the company as well as its experience and commitment.
OLMEX SA, Barczewo
OLMEX SA, BarczewoBoard Member, Measuring Apparatus Director
Read More
We hereby inform you that on the basis of the analysis of acceptance test documents and cable diagnostics documents based on partial discharge measurements performed by two independent measurement teams at the Pągów Wind Farm near Namysłów, we have found a high quality of installation of 17 MV 12 / 20kV cable lines. We highly appreciate the quality of the work performed and the professional competence of the employees responsible for the implementation of the above-mentioned task. We recommend PREiB El-Mark Marek Kierznikowicz based in Wejherowo as a reliable contractor of installation services on the MV cable network.

see our projects in Poland and Germany

Power engineering

Renewable

Realizations

Check what we have built

Our projects

Building a network

distribution and transmission

Realizations

Check what we have built

Our projects

Infrastructure

fiber optic

Realizations

Check what we have built

Our projects

News

OFFICIAL OPENING OF THE DĘBSK WIND FARM

On Thursday, April 13, the official opening of the Dębsk wind farm, the largest onshore wind farm built by Polenergia, took place. We participated in its creation, being responsible for a comprehensive one

Read more "

Commissioning of the Grabowo wind farm

We are pleased to inform you that in recent days the Grabowo wind farm with a total capacity of 44MW has been connected to the grid, for the construction of which we were responsible in terms of energy.

Read more "

Christmas wishes

On the occasion of Christmas and the upcoming New Year, we would like to thank you for your cooperation so far and wish you a lot of joy, serenity and all the best.

Read more "

We have ISO Certificate!

We are pleased to inform you that El-mark Sp. z o. o. Sp. kom. obtained a certificate confirming the implementation of the Quality Management System in accordance with the ISO 9001:2015-10 standard in the scope of: Construction

Read more "

Join the best

submit the application

ELMARK POLAND

ELMARK GERMANY

RENEWABLE ENERGY

thumbnail_image002
image001
IMG_4989
IMG_20190821_151506

VOCATIONAL ENRGETICS:

IMG_3152
IMG_8847
photo 13

Construction of fiber optic infrastructure

image002
photo 25
El-mark-construction-480x600