ELMARK - reliability and trust

We build with energy
and passion

Together since 1989

We have been on the market since 1989. We started our activity from small electric orders, slowly developing both the scope of our services and the area of activity throughout Poland and Germany. Today, meeting the challenges of the market, we are dynamically operating in the power and teletechnical industry, and we are passionate about implementing wind farm projects.

We want our clients to be sure that the commissioned work, regardless of the difficulties, will be performed with the utmost care, conscientiously and on time. Responsibility for a given word is our motto. Our specialists, thanks to the experience gained and the possibility of using modern equipment, will cope with the greatest challenges!

Cooperation with ELMARK means credibility and trust - and thus the peace and safety of our clients.

We employ qualified technical staff, we cooperate with design offices and experts in the field of energy, law, IT and management. The quality of our services is guaranteed by numerous references, as well as awards and distinctions.

We invite you to cooperation.

Latin
experiences
0
Qualified
employees
0
Built lines
medium voltage
0 Thanks
Built lines
high voltage
0 Thanks
Built networks
fiber optic
0 Thanks

We work

in harmony with nature

We like

Challenges

Our greatest value is

committed employees
our offer

Renewable energy

Construction of MV and WN cable lines
Construction of fiber optic lines
Installation of heads and MV and WN cable joints
Construction of cable junctions and container transfer stations
Removal of collisions with LV, MV and HV overhead lines

Commercial Power Industry

Construction of LV, MV and WN cable lines
Construction of LV and MV overhead lines
Construction of pole and container transformer stations
Construction of LV and MV cable connectors

Fiber optic infrastructure

Construction of a fiber optic sewage system
· Blowing fiber optic cables
Welding of optical fibers

Installation of cable accessories for up to 400 kV

we cooperate with hardware manufacturers from all over Europe

Cable line measurements

· Damage location
Insulation resistance measurements
· Voltage tests

COMPLETED PROJECTS

Power engineering

renewable

Realizations

Check what we have built

Our projects

Building a network

distribution and transmission

Realizations

Check what we have built

Our projects

Infrastructure

fiber optic

Realizations

Check what we have built

Our projects
Gallery

Watch ours
latest catalog

Our partners

News

Merry Christmas!

This year, we celebrated our company Christmas party in unusual circumstances – instead of a hotel hall, we met at our headquarters. There were training sessions, carols, and wishes 🎁
During this time, we especially remember the founder of our company, Marek Kierznikowicz, who passed away a year ago. In the past year, the thought of Him has constantly accompanied us. ❤️

Thank you to our Clients, Suppliers, and Partners for a year of intensive cooperation, trust, kindness, and for the ambitious projects we had the opportunity to realize together.

We wish you a healthy, joyful, and warm Christmas, and may the coming year bring us all much good.

Elmark wins the Golden Crane Success Award 2024

We sincerely thank Bank Kaszubski for honoring our company with the Żuraw Sukcesu 2024 award.
This is a special honor for us, which is not only proof of recognition but also a confirmation of many years of fruitful cooperation.

Thank you to the Bank's Management and all Employees involved in servicing our company – for your support, openness, and partnership approach.

Congratulations also on organizing a wonderful, celebratory gala where this year's awards were presented.

We are implementing WATUCAB technology

We have implemented an innovative technology for installing medium and high voltage power cables using the WATUCAB device.

This is an advanced installation system that uses water pressure as a medium to transport cables through pipelines. This solution significantly reduces the risk of cable damage, which often occurs with traditional installation methods, while increasing the safety and reliability of the entire system's operation. WATUCAB also enhances work efficiency and minimizes environmental impact.

Our team has undergone appropriate training for system operation and is ready to undertake further projects using this technology.

Merry Christmas!

Elmark wins the Golden Crane Success Award 2024

Join the best

submit the application

ELMARK POLAND

ELMARK GERMANY

Construction of fiber optic infrastructure

CONSTRUCTION OF FIBER OPTIC INFRASTRUCTURE | El-Mark
CONSTRUCTION OF FIBER OPTIC INFRASTRUCTURE | El-Mark
CONSTRUCTION OF FIBER OPTIC INFRASTRUCTURE | El-Mark

VOCATIONAL ENRGETICS:

PROFESSIONAL ENERGY | El-Mark
PROFESSIONAL ENERGY | El-Mark
PROFESSIONAL ENERGY | El-Mark

RENEWABLE ENERGY

RENEWABLE ENERGY | El-Mark
RENEWABLE ENERGY | El-Mark
RENEWABLE ENERGY | El-Mark
RENEWABLE ENERGY | El-Mark