We build with energy
and passion

30 years together

We have been on the market since 1989. We started our activity from small electric orders, slowly developing both the scope of our services and the area of activity throughout Poland and Germany. Today, in order to meet the challenges of the market, we are dynamically operating in the power and teletechnical industry, and we are passionate about implementing wind farm projects.

We employ qualified technical staff, we cooperate with design offices and experts in the field of energy, law, IT and management.

We are constantly developing our machine park, which enables us to perform the works we offer in a timely and professional manner.

The quality of our services is guaranteed by numerous customer references, as well as awards and distinctions. We invite you to cooperation.

our offer

POWER ENGINEERING
renewable

  • Construction of MV and WN cable lines
  • Construction of fiber optic lines
  • Installation of MV and WN cable heads and joints
  • Construction of cable nodes and container transformer stations
  • Removal of collisions with LV, MV and HV overhead lines

Power engineering
professional

  • Construction of LV, MV and WN cable lines
  • Construction of LV and MV overhead lines
  • Construction of pole and container transformer stations
  • Construction of LV and MV cable connectors

Resource 1

Infrastructure
Fiber optics

  • Construction of a fiber optic sewage system
  • Blowing fiber optic cables
  • Welding of optical fibers

Measurement
cable lines

  • Damage location
  • Insulation resistance measurements
  • Voltage tests

working

in harmony with nature

We like

challenges

Our greatest value is

committed employees

partners

Electrum Sp. z o. o. Białystok
Electrum Sp. z o. o. BiałystokVice President
Read More
We certify that PREiB El-Mark Marek Kierznikowicz based in Wejherowo was the contractor of the WN-110Kv cable line from GPO Rajgród - GPZ Grajewo, with a total length of 11.2 km with a fiber optic line with a total length of 11.45 km, for the needs of the Wind Farm Rajgród. The works were carried out in the period from April 2013. until June 2014 according to the previously agreed schedule. The El-Mark company is a professional in the industry, perfectly organized and equipped.
GEO RENEWABLES based in Warsaw
GEO RENEWABLES based in WarsawMember of the Group Management Board
Read More
We certify that PREiB El-Mark Marek Kierznikowicz, based in Wejherowo, was the contractor of the WN-110kV cable line from GPZ Lubartów to GPO Rudzienko, with a total length of 27.5 km, with a 48J fiber line with a total length of 27.5 km for the needs of the Lubartów Wind Farm. The cable line consisted of 18 sections, to be connected and connected, the El-Mark company made 17 sets of MSA145 joints with earthing and crossbonding boxes and 2 sets of ESS145 heads. The works were carried out in the period from June 2015 to October 2015, in accordance with the agreed schedule. Noteworthy is the high and professional equipment of the El-Mark company and a very good organization of work. It is a reliable and trustworthy contractor.
Electrum Sp. z o. o. Białystok
Electrum Sp. z o. o. BiałystokVice President
Read More
Electrum Sp. z o. o. ul. Watykańska 13, 15-638 Białystok confirms that PREiB El-Mark Marek Kierznikowicz was the contractor for laying the HV 110kV cable line from GPO Skurpie - GPZ Działdowo with a total length of 8.26 km. The works were carried out in the period from October 2014 to November 2014, according to the schedule. Noteworthy is the high and professional equipment of El-mark and a very good organization of work, which, despite the emerging obstacles, allowed for the timely and fully professional performance of the entrusted task. We assess the quality of the works performed as very good, and the flexibility and communication skills of the company are an additional premise for recommending it to other investors as a reliable, responsible and trustworthy contractor.
PBDI SA, Toruń
PBDI SA, ToruńVice President
Read More
PREiB El-Mark Sp. z o. o. with its seat in Wejherowo, performed works consisting in the construction of the power grid for the needs of Tolkowiec Wind Park for PBDI SA with its seat in Toruń at ul. Wapienna 10 in the following scope: - construction of MV-30kV cable lines with 12J fiber-optic lines with a total length of 14.6 km, along with the assembly of MV cable couplings and heads and fiber optic splitting, - construction of a field earthing system. Completion date February 2014 - August 2014. The commissioned works were performed in a proper manner, in accordance with the principles of good construction practice and maintaining the appropriate standards and technical parameters. The works were completed correctly and on time. We confirm the organizational efficiency of the company as well as its experience and commitment.
OLMEX SA, Barczewo
OLMEX SA, BarczewoBoard Member, Measuring Apparatus Director
Read More
We hereby inform you that, based on the analysis of the acceptance test documents and the cable diagnostics documents based on partial discharge measurements performed by two independent measurement teams at the Pągów Wind Farm near Namysłów, we have found a high quality of installation of 17 MV 12 / 20kV cable lines. We highly appreciate the quality of the work performed and the professional competence of the employees responsible for the implementation of the above-mentioned task. We recommend PREiB El-Mark Marek Kierznikowicz based in Wejherowo as a reliable contractor of installation services on the MV cable network.

see our projects in Poland and Germany

Power engineering

renewable

Realizations

Check what we have built

Our projects

Building a network

distribution and transmission

Realizations

Check what we have built

Our projects
Resource 1

Infrastructure

Fiber optics

Resource 1

Realizations

Check what we have built

Our projects

News

Christmas wishes

We wish all our Clients, Suppliers and Employees our best wishes for a healthy and happy Christmas. We thank you for your cooperation so far and we wish you success in 2021. Management

Read more "

Join the best

submit the application

ELMARK POLAND

ELMARK GERMANY

RENEWABLE ENERGY

image001
IMG_4989
IMG_20190821_151506

VOCATIONAL ENRGETICS:

IMG_3152
IMG_8847
photo 13

Construction of fiber optic infrastructure

image002
photo 25
El-mark-construction-480x600