OUR NEXT IMPLEMENTATION COMPLETED SUCCESSFULLY

Publish this post

On October 7, in Wrotków, one of the largest wind parks in Poland was officially opened, which includes the Słupca-Kołaczkowo wind farm, Kożmin Wlkp., Jarocin East and Krotoszyn. Our scope included the construction of MV and WN cable lines with a total length of 129 km.

The total installed capacity is 102.5 MW, which, at peak load, will provide electricity to over 60 thousand. households.

also check

OFFICIAL OPENING OF THE DĘBSK WIND FARM

On Thursday, April 13, the official opening of the Dębsk wind farm, the largest onshore wind farm built by Polenergia, took place. We participated in its creation, being responsible for a comprehensive one