Construction of the HV and MV cable line - Potęgowo Południe wind farm

Publish this post

Our works on the construction of the Potęgowo Południe wind farm project are coming to an end. Our task was to build a HN-110kV cable line and two fiber optic lines with a length of about 24km, between SE Słupsk Wierzbięcino and GPO Bięcino 2, as well as MV-30kV cable lines and fiber optic lines with a total length of about 63km, for the purpose of power evacuation from WF Wieliszewo in the province . Pomeranian.  

We would like to thank our Principal, the Team and people involved in this project for their cooperation.

also check

OFFICIAL OPENING OF THE DĘBSK WIND FARM

On Thursday, April 13, the official opening of the Dębsk wind farm, the largest onshore wind farm built by Polenergia, took place.

We participated in its creation, being responsible for the comprehensive construction of 85 km of MV - 30kV cable lines together with a fiber optic line, thus connecting 55 turbines.

Our scope also included the assembly of cable joints and heads.

The total capacity of the farm is 121 MW.

"Crane of Success 2022" from Kashubian Bank Spółdzielczy

On March 10, 2023, during the official gala, Kaszubski Bank Spółdzielczy awarded us the first distinction "Crane of Success 2022" for many years of cooperation and trust.

This special award is a proof of recognition for our partner relations, mutual respect and trust, for which we are extremely grateful.